Ⅵ. The Temporary Plan of Construction
(I)The Layout Principles for the Temporary Construction
The layout principles for the temporary construction are the combination of temporary and long-term construction, occupying less farmland and utilizing the local facilities as many as possible. The details of temporary construction can be seen in “The Temporary Plan of Construction Figure”.
The Temporary Plan of Construction Figure
Project Name Unit Amount Remark
I. The Electricity Used by the Construction and the Communication
1. The Electric Wires km 12.4 The partial electric wires brought in and brought out at each constructing site
2. The Communicative lines km 4.8 It’s introduced along the communicative lines.
II. Temporary pavements and bridges
1. The New-built Pavements km 16.70 Including the pavements connecting to the local branch roads, the horizontal pavements and the pavements leading to soil- abandoned spot, prefabricating place and concrete mixture station
2. Repaired Roads km 20.00
3. Temporary Bridges m/seat 80/8 1seat is 10meters
4. Temporary Culverts m/seat 120/15 The length of each is 8 meter, and there are 15 seats culverts.
III. Tabernacles
1. The Living Houses of the Project Staff and Office Houses m2 1500
2. The Living Houses of the Constructing Workers m2&